Jiangsu Bosheng Science Technology Co., Ltd.

We main product/services:
  • Steel Pole
  • Signal Pole
  • Street Light Pole
  • Company Profile:
    Year Established:2007
    Businss Type:Manufacturer
    Contact:Ms. Rachael Peng (Foreign Trade)
    Telphone:86-510-87878787
    Fax86-510-87877898
    MobilePhone:8613812063841
    Web Site:www.jsbosheng.com/index.asp  
    Zip:214211
    Country/Region:
    Province/State:Jiangsu
    City:yixing
    Address:Heqiao Industrial zone,Yixing City,Jiangsu Province,China    
    Product display:More
    Introduce:
    Name: Jiangsu Bosheng Science & Technology Co., Ltd.
    Brief Introduction:
    <1>The company is located in the graceful and rich water countryside south of the Changjiang River, in the famous Pottery City-Yixing with the clime advantage in geography as well as in transport. She owns a floor area of 15,000sqm and workshop area of 15,000sqm, with an annual production capacity of 18,000 tons.
    <2> She has registered capital of 36 million RMB and full-time staff of more than one hundred. She owns higher mechanization degree and modern technology and equipment. She has introduced whole set of good-sized numerical control
    hydraulic folding equipment , a series of good-sized professional equipments of armor plate-flatted machine, lengthways cut machine, numberical control cut machine, auto-closed up machine, auto-arc-weld machine, hydraulic redressing straight machine, etc. She produces all sorts of conical, pyramidal, cylindrical steel poles with production range of dia 50mm-5000mm, thickness 1mm-35mm, once taking shape 16000mm long, and large-scale steel components.
    Main Product:
    <1>distribution and transmission poles
    <2>transmission line steel poles
    <3>substation tubular poles
    <4>telecommunication poles
    <5>wind power poles
    <6>traffic signal poles
    <7>large advertising board poles
    <8>street lamp and courtyard lamp poles
    <9>steel structure
    Processing and production process
    1 contact
    2 design
    3 select material with care
    4 cuts the steel products
    5 drill hole
    6 straighten
    7 Galvanization
    8 Installation of equipment
    9 inspection and adjustment
    10 packing
    Installation flowchart
    NO1:1 have a joint checkup on the blue prints for a project
    2 have a joint checkup on the blue prints for a project
    3 education of safe,fire protection,discipline
    NO2:foundation Back Checking
    1 side distance
    2 diagonal line check spare-parts
    3 horizontal
    NO3:1 Installation of tower bottom
    2 Adjust side distance, diagonal line, horizontal
    3 tighten up all of the screw
    NO4:1Installation of the first paragraph
    2 Adjust the verticality,Diagonal line
    3 tighten up all of the bolts
    NO5:1 Installation of the second paragraph
    2 Adjust the verticality,Diagonal line
    3 tighten up all of the bolts
    NO6: repeat steps as described above
    NO7:1Install the top
    2 Adjust the verticality,Diagonal line
    3 tighten up all of the bolts
    NO8:Adjust the verticality,tighten up all of the bolts
    NO9:Install platform,ladder,GSM Antenna stand,Feeder Rack
    NO10:clear the site
    NO11:final acceptance of con